Improved road links for Weymouth & Portland: route options (1991)

From the many decades spent drawing and redrawing Weymouth relief roads. One of those killed off by the new realism, Weymouth’s hosting 2012 Olympic events meant that something like the Orange route eventually did get built (but scaled back to single carriageway and with slightly better attempts to make it an actual relief road rather than the typical 1980s pump more traffic in road).